SMED (Single-Minute Exchange of Dies) is a lean manufacturing technique aimed at reducing the time required to change a machine or production line from one product to another. The goal is to perform these changeovers in less than ten minutes, thereby minimizing downtime and increasing production efficiency.

Why does your business need SMED?

  1. Reduced Downtime: SMED techniques minimize the time required for equipment setup and changeovers, reducing downtime between production runs.
  2. Increased Flexibility: Faster changeovers enable industries to respond quickly to changing customer demands and production requirements.
  3. Higher Productivity: With shorter changeover times, more time is dedicated to actual production, leading to increased output and efficiency.
  4. Cost Savings: Reduced setup times translate to lower production costs per unit, contributing to overall cost savings.
  5. Improved Quality: Faster changeovers often lead to fewer errors and less variability in production processes, resulting in improved product quality.
  6. Enhanced Capacity Utilization: By minimizing setup times, SMED allows for better utilization of equipment and resources, optimizing production capacity.
  7. Lean Principles Alignment: SMED aligns with lean manufacturing principles by eliminating waste associated with long changeover times.